Ulltra
Ulltra
Ulltra
Fipronil 2.92% w/w Emulsifiable Concentrate (EC) is recommended for the control of termites in buildings through pre & post construction treatments
Recommendation
| Crop(s) | Common Name of Pest | Dosage/HA | Dilution in Water (L) | Waiting Period between last spray to harvest (days) | Re-entry after each Application (In Hours) | |
|---|---|---|---|---|---|---|
| AI (g) | Formulation (ml) | |||||
| Chickpea | Mites | 0.014/L | 0.75 ml/L water | 500-1000 | 3 | - |
| Rose | Two spotted spider mites | 7.2-12 | 400-666 | 500 | 3 | - |
| Roses | Red spider mites(Tetranychus urticae) | 0.00048-0.00096% | 0.025-0.05% | 500 | 3 | - |
Direction Of Use
Fipronil 2.92% w/w EC (Agenda? 25 EC) shall be applied at
0.25% a.i. concentration i.e. 100 ml formulated product
diluted in 1 litre of water for the control of termites in
buildings during pre and post construction. Treatment
should be as per IS 6313
(Part-2): 2001 i.e. Pre-constructional chemical
treatment measures and IS 6313
(Part-3): 2001 i.e. treatment for existing building
as follows.
Pre-Construction: The chemical emulsion shall be
applied uniformly at the prescribed rate in all the stages
of treatment. Hand operated sprayer or watering can should
be used for application of chemical emulsion.
Treatment of Masonry Foundations:
Bottom surface and
sides of foundation pits upto a height of 30 cm should be
treated @ 5 ltr. chemical emulsion per sq. mtr of surface
area.
Back fill earth in
immediate contact with the foundation structure should be
treated @ 7.5 ltr per sq. mtr. of the vertical surface, of
the substructure for each side.
Treatment of RCC
Foundations: Treatment should start at a depth of 50 cm
below ground level @ 7.5 ltr. per sq. mtr.
Treatment of Top
surface of plinth filling: The top surface of the
consolidated earth within plinth walls shall be treated
with chemical emulsion at the rate of 5 ltr/m2 of the
surface before the sand bed or sub-grade is laid.
Soil treatment along
external perimeter of building: Earth along the external
walls of the building should be rodded at intervals of 15
cm and to a depth of 30 cm exposing the foundation wall
surface. Chemical solution should be poured along the wall
@ 7.5 ltr per sq. mtr of vertical surface.
Treatment of soil
under apron along external perimeter of Building: Top
surface of the earth over which the apron is to be laid
shall be treated with chemical solution @ 5 ltr per sq.
mtr. of the vertical surface.
Construction:
Soil treatment along
external perimeter of building: Earth along the external
walls of the building should be rodded at intervals of 15
cm and to a depth of 30 cm exposing the foundation wall
surface. Chemical solution should be poured along the wall
@ 7.5 ltr per sq. mtr. of vertical surface. of Building:
Top surface of the earth over which the apron is to be
laid shall be treated with chemical solution @ 5 Ltr per
sq. mtr. of the vertical surface.
Treatment of soil
under apron along external perimeter of Building: Top
surface of the earth over which the apron is to be laid
shall be treated with chemical solution @ 5 Ltr per sq.
mtr. of the vertical surface.
Treatment of soil
under floor: To prevent entry of termites from cracks,
soil under floor should be treated. Drill 12 mm holes at
the junction of floor and wall at 30 cm interval to reach
the soil below. Squirt the chemical solution @ 1 ltr per
hole and seal.
Treatment of voids in
masonry: The movement of termites through masonry walls
may be restricted by drilling holes in masonry wall at
about 45? angle preferably from both sides of the plinth
wall at 30 cm interval and squirt the chemical in holes
till refusal and seal the holes.
Treatment of Upper Floors:
In case of infestation in upper floors, treat ground floor
of the existing building as described above. Equipment:
Hand operated knapsack sprayer or foot sprayer is
recommended
Time of Application
Apply the insecticide when first incidence observed and repeat application as necessary.